Another activity completed
Return
During October, the A19.A21. activity (“Model validation and simulation”) was completed. This activity was carried out in the period from September 1, 2021 to October 31, 2022 through seven phases. As a deliverable, a report on the results of model validation and simulations based on measurements at control locations was provided.